Home

How it works

Homes aren't built here. They're assembled.

While a conventional build is still pouring its foundation, your house is already being made at the factory. Here is the whole path – no small print.

Four steps to moving in

Four steps – and you're home.

  1. Choose a model

    Together we pick the model and specification for your site and budget.

  2. Production

    The house is assembled at the factory, with every joint quality-checked.

  3. Delivery and assembly

    The house kit arrives at your site and our crew assembles it on prepared footings.

  4. Moving in

    Utilities connected, every system tested – and the keys are yours.

Questions and answers

  • A light foundation is enough: screw piles or concrete footings. That's 3–5 days of work, no heavy machinery.

  • Yes. 100 mm of stone wool around the entire envelope, energy-saving 6+12+6 Low-E glazing and a sealed steel frame are built for year-round living.

  • Electrics to EU standard; water and sewerage connect to your mains or to standalone systems (a well, a septic tank).

  • Yes, we arrange viewings of demo units. Leave a request and we'll agree on a visit.

Tell us about your site

We'll reply within a working day, suggest a model and calculate delivery.

+380 00 000 00 00